Protect Your Capital Before You Break Ground

Pre-Construction & LaunchPad

Our three-phase Franchise LaunchPad gives you the data, planning, and protection you need before a single nail is driven — so there are no surprises when construction begins.

Overview

The Most Expensive Construction Mistakes Happen Before Construction Starts

Most franchise operators lose money on their buildout before construction even begins. They sign leases without understanding the true cost of the space. They finalize financing based on estimates that bear no resemblance to reality. They start construction with permit drawings that haven't been stress-tested against the actual site conditions.

The Olive Tree Franchise LaunchPad is a structured three-phase pre-construction service designed to eliminate these risks. We give you hard data, realistic budgets, and a fully coordinated construction package before you commit to a single dollar of construction spending.

Every dollar you invest in the LaunchPad is credited toward your full construction contract — so it's not a cost, it's a deposit on certainty.

What's Included
  • Phase 1: 60-minute strategy call with Nathan Oliveira
  • Phase 1: Site viability assessment from photos and plans
  • Phase 1: Lease leverage and MEP risk identification
  • Phase 2: Physical on-site audit and stress test
  • Phase 2: Written Risk Analysis Report (HVAC, grease interceptors, permits)
  • Phase 2: Realistic project budget for financing approval
  • Phase 3: Full design coordination with architect and engineers
  • Phase 3: Finalized permit-ready drawings
  • Phase 3: CPM construction schedule with critical path
  • Phase 3: Value engineering to optimize build cost
  • Phase 3: Change order protection through design-phase presence
How It Works

Our Process

Step 01

Phase 1 — Viability Assessment ($500)

A 60-minute strategy call with Nathan to assess site viability, identify red flags, and determine whether your location is a good fit for your concept — before you sign your lease.

Step 02

Phase 2 — On-Site Audit ($2,000)

We physically visit your space and produce a written Risk Analysis Report covering HVAC capacity, grease interceptor requirements, permit complexity, and a realistic project budget.

Step 03

Phase 3 — Full Pre-Construction ($20k–$40k)

We coordinate your architect and engineers, finalize permit-ready drawings, build your CPM schedule, and lock in your construction package — with full change order protection.

The Olive Tree Difference

Why Clients Choose Us

Real Numbers Before You Commit

Our Phase 2 audit produces a budget that's grounded in actual site conditions — not a napkin estimate based on square footage.

Lease Protection

We identify landlord traps, MEP deficiencies, and permit risks before you sign — so you negotiate from a position of knowledge, not hope.

Fully Credited Investment

Every dollar you spend on the LaunchPad is credited toward your full construction contract. It's not a cost — it's a deposit on certainty.

Change Order Protection

By being present through the design phase, we ensure our construction pricing stays solid. No surprises when the shovel hits the ground.

Financing-Ready Budget

Our Phase 2 budget report is structured to support loan applications and franchisor financial disclosure requirements.

Franchisor Coordination

We manage the franchisor approval process for your design package — so you don't have to navigate that relationship alone.