Keys in Hand, Ready to Open

Project Delivery

Final walkthrough, punch list completion, and systems testing. We ensure everything meets your exact specifications before handing over the keys.

Timeline: 1-2 weeks
Deliverable: Occupancy permit, completed punch list, systems commissioning reports

Project delivery is more than handing over keys. It is a structured process to ensure that every system works, every finish is complete, and you are fully prepared to open your doors.

Final Walkthrough

We conduct a comprehensive final walkthrough with you and your team. We go through every room, every system, every finish — documenting anything that does not meet the standard. This becomes your punch list.

Punch List Completion

Every item on the punch list is completed before we consider the project closed. We do not consider a project delivered until you are satisfied with every element of the build.

Systems Testing

We test every mechanical, electrical, and plumbing system — HVAC commissioning, electrical panel verification, plumbing pressure tests, fire suppression system testing, and any specialized systems your franchise requires.

Franchisor Final Inspection

We coordinate and attend the franchisor's final inspection, ensuring all required documentation is in order and all brand standards are met.

Occupancy Permit

We manage the occupancy permit process with the municipality, ensuring you have all required approvals to legally open your business.

What You Leave With

A fully completed, inspected, and approved space — ready for your equipment installation, staff training, and grand opening.